已经有次观看 wencong在2013-07-12发布
简介:Second question chapter Tungsten - tailings, hanging lake safety hazards will subside?
In addition to pollution problems, chapter Tungsten is also important to note that its tailings security issues.
Composed for slag and waste tailings, the state has strict rules, which states that more than one million cubic meters of tailings are above major hazard, while chapter Tungsten Lei Shi tungsten mine tailings design capacity reached 1.06 million cubic meters, but such a major hazard in the site, started the process of running, even every link in the violation.
In addition to pollution problems, chapter Tungsten is also important to note that its tailings security issues.
Composed for slag and waste tailings, the state has strict rules, which states that more than one million cubic meters of tailings are above major hazard, while chapter Tungsten Lei Shi tungsten mine tailings design capacity reached 1.06 million cubic meters, but such a major hazard in the site, started the process of running, even every link in the violation.
视频相关评论
loading...